SAP compliance

When your building fails SAP targets, we design the solar strategy to make it pass.

If performance gaps, DER shortfalls or limited roof space are stopping a dwelling or block from passing Part L, we design a solar-led strategy to close the gap.

MCS certified installation

G98 / G99 DNO handling

3D modelling & PVGIS data

Greater London coverage

The problem

Why buildings fail SAP

Many projects fall short of Part L compliance because solar was treated as an afterthought rather than an engineered solution. The result: the project cannot be signed off for occupation.

  • Insufficient roof area

    Available roof space cannot support required kWp capacity

  • Shading limits

    Surrounding structures reduce effective solar generation

  • Poor system sizing

    System was not optimised for compliance targets

  • Heat loss issues

    Communal heat loss increases energy demand beyond solar offset

  • PV as afterthought

    Solar added too late in the design process to be effective

A solar-led strategy can resolve these issues without structural changes.

Our approach

How we get you to compliance

We can work with your existing SAP assessor or manage the process from the ground up with our own trusted assessor team.

01

Performance gap review

We review the current SAP results or begin a fresh assessment if required. This identifies where the building is falling short and by how much.

02

Assessment and scenario development

If you already have an assessor, we coordinate and refine improvement scenarios. If not, we can appoint and manage a new SAP assessment from scratch.

03

Solar-led optimisation

We design the optimal PV configuration, panel placement, kWp sizing and string layout, designed around your building's constraints and the size of the gap.

04

Compliance delivery

We manage system specification, solar installation and final SAP alignment, and we take responsibility for the compliance result.

Where this applies

Projects we help

  • New developments

    Residential developments struggling to meet SAP targets

  • Flat conversions

    Block conversions with limited roof capacity

  • Extensions

    Extensions requiring updated SAP calculations

  • Renovations

    Renovation projects triggering Part L compliance

Deliverables

What you receive

  • Solar optimisation strategy

    Full strategy tailored to your project’s compliance gap

  • kWp configuration

    Recommended kWp configuration and system layout

  • Managed SAP pathway

    Coordinated SAP pathway, new or existing assessment

  • Implementation plan

    Clear implementation and delivery plan

  • Coordinated installation

    PV installation managed to ensure compliance

  • Compliance outcome

    We take ownership of the SAP compliance result

Case example

North London residential block

A residential block that could not reach its SAP target on the available roof area. A hybrid, distributed solar strategy closed the gap with no structural changes to the building.

  • 100%

    SAP compliant

  • 0

    Structural changes

  • Hybrid

    Solar strategy

SAP optimisation

Frequently asked questions

Timescales, assessors and what happens next.

Still have a question?

Our UK team is happy to help, whether you're choosing a kit or filling in the G98 form.

Contact us
Get your SAP strategy review Free assessment · No obligation

Get a quote

Get your SAP strategy review

Tell us about the project and SAP performance gap. We’ll assess the shortfall and outline a solar optimisation strategy.